AutoNetUSA › Paul Miller BMW › 2025 BMW M5
2025 BMW M5
· Sedan
Market Price$113,999
Dealer Discount−$5,000
Doc Fee$995
MSRP$113,999
Paul Miller Price$109,994
$4,005 below MSRP
Price excludes tax, title, registration. Doc fee shown above.
Price and availability from Paul Miller BMW’s own listing as of Oct 14 — vehicles can sell or move at any time; confirm final price and availability with the dealer.
Establishing this vehicle’s Google entity
🛡️ NHTSA Safety ratings & Recalls ↓Pricing, availability, and equipment can change at any time. Please confirm all details directly with Paul Miller BMW.
Specifications
Features & options
BMW Iconic Glow Kidney GrillePower Rear Sunshade and Rear Side Window ShadesFront Ventilated SeatsFront and Rear Heated SeatsInterior CameraParking Assistant PlusACC Stop and Go + Active Driving AssistantCarbon Fiber Silver Thread High Gloss TrimM Compound Brakes with Red CalipersTires: 285/40R20 Front and 295/35R21 Rear
About this vehicle
Is this 2025 BMW M5 your perfect car? Contact Paul Miller BMW to see this Carbon Black Sedan available for $112994
Safety & Recalls2025 BMW M5 · U.S. DOT / NHTSA data
2 open recall campaigns for this model — repairs are performed at no charge to the owner.
- ELECTRONIC STABILITY CONTROL (ESC) · NHTSA 24V104000
- ELECTRICAL SYSTEM · NHTSA 26V096000
📍 1515 NJ-23, Wayne, NJ 07470, USA📞 (973) 658-6472
VIN-specific completion status is confirmed at the dealer.
Source: official NHTSA data · nhtsa.gov · model-level; ratings shown for the primary tested configuration.
