AutoNetUSA › Paul Miller BMW › 2026 BMW M3 Competition xDrive
2026 BMW M3 Competition xDrive
1 / 27 · ⛶ expand

2026 BMW M3 Competition xDrive

Competition xDrive · Sedan
Market Price$97,999
Dealer Discount−$9,000
Doc Fee$995
MSRP$97,999
Paul Miller Price$89,994
$8,005 below MSRP
Price excludes tax, title, registration. Doc fee shown above.
Price and availability from Paul Miller BMW’s own listing as of Oct 14 — vehicles can sell or move at any time; confirm final price and availability with the dealer.
View at Paul Miller BMW →
◆ What Google Sees →
⛽ EPA Fuel Economy & Range ratings ↓

Pricing, availability, and equipment can change at any time. Please confirm all details directly with Paul Miller BMW.

Specifications

Engine3.0L I-6 cyl
TransmissionAutomatic
DrivetrainAll-Wheel Drive
FuelGasoline
MPG16 city / 23 hwy
Mileage14,512 mi
ExteriorAlpine White
InteriorBlack
BodySedan
Doors4
Conditionused
Stock #VFX24985A
VINWBS33HJ04TFV78436

Full Specifications · the 2026 BMW M3 spec sheet

Horsepower523 hp
Torque479 lb-ft
Transmission8-Speed Automatic
DrivetrainRWD
MPG16 city / 23 highway
Annual fuel cost (EPA)$4550/yr
EPA GHG score3 / 10
MPG combined (EPA)18 combined
5-year fuel cost vs. average (EPA)$10,750 more in fuel over 5 years vs. the average new vehicle

Features & options

Galvanic ControlsFull LED Headlights with Cornering LightsBMW Curved Display with HUDParking Assistant PlusDrive RecorderParking View with 3D ViewActive Park Distance Control with Side ProtectionM Drive ProfessionalM Shadowline LightsWheels: 19\M Compound Brakes with Black CalipersCarbon Fiber TrimPower Front SeatsLumbar SupportHeated Front Seats

About this vehicle

Is this 2026 BMW M3 your perfect car? Contact Paul Miller BMW to see this Alpine White Competition xDrive Sedan available for $96994

Fuel Economy & EnvironmentGasoline Vehicle · U.S. EPA estimates
18
MPG combined
16
MPG city
23
MPG highway
$4550
Annual fuel cost
3/10
Greenhouse gas rating
$10,750 more in fuel over 5 years vs. the average new vehicle
Source: official U.S. EPA data · fueleconomy.govRanges reflect the model’s EPA-tested configurations; actual results vary.View this model’s full EPA label →